Floating Platform for Indian Customs at Devgad, Maharashtra

Project Details Total Area: 120 Sq. Mtr. (HDPE Modular Floating System) Main Pontoon : 1 Finger Pontoon : 1 Steel Gangway: 01 (09 mtr. X 1.3 mtr.) Shore Spacer Bar : 2
Floating Platform for Indian Customs, Ratnagiri, Mahatashtra

Project details Total Material : 325 Sq. Mtr. (HDPE Modular Floating System)Main Pontoon : 1Finger Pontoon : 3Steel Gangway : 02 (11 mtr. x 1.3 mtr.) : 2Shore Spacer Bar : 5
Floating Jetty at Largi Dam, Himachal Pradesh

Floating Jetty at Mysore, Karnataka for Indian Army

Project DetailsMaterial – ACR Dock HDPE Modular SystemProduct – HDPE Pontoon with Marker Buoy and Portable CabinTotal Area – 45 Sq. MtrLocation – Mysore, Karnataka for Trishna Sailing ClubCompletion Date – 28th November 2017
Floating Platform for Spice Jet Sea Plane Landing in Marine Drive Bay – Mumbai

Self-Propelled Pontoon at New Town, Eco Park, Rajar hat, Kolkata

Project Details: Total Area: 30 sq mtr. Location: Eco Park, Rajar hat, Kolkata. Material: ACR Dock HDPE Modular System Anchoring System: Concrete blocks, with pulley and rope Completion date: Dec 2013
Floating Jetty for Tourism at Dudhani Lake in U.T of Dadra and Nagar Haveli, Silvassa

Project Details: Total Area – 185 Sq. mtr Location: Dudhani Lake in U.T of Dadra and Nagar Haveli, Silvassa Material: ACR Dock HDPE Modular System Completion date: 28th May 2014
HDPE Floating Dock, Elevated Walkway & Pontoon Boat for Ferry Service from ‘Versova’ to ‘Madh’, Mumbai

Project Details: HDPE Floating Dock : 245 Sq. mtr Elevated Walkway with WPC: 60 Mtr x 1.5 mtr 24 ft. Pontoon Boat with 2 x 40 HP Suzuki OBM Location: Versova – Madh, Mumbai, Maharashtra Completion date: May 2015
Floating ‘Marina’ for Fast Interceptor Crafts (FICs) at Naval Base Kochi

Project Details:Main Pontoon : 12 m x 2.4 m x 4Finger Pontoon : 20 m x 2 m x 5Landing Pontoon : 5 m x 3.5 m x 1Gangway : 12 m x 1.8 m x 1 10Boat Berthing Systems (Boat Size 14 mtr.)Location : Southern Naval Command, Kochi, KeralaCompletion date : May 2015
Tehri – Log Hut Project

Tehri – Pontoon Project

Total Area: 532 Sq Mtr i. 3 Nos of “T” Shape Floating Jetties : 373 Sq Mtr ii. 01 No of Para Sailing Dock in “I” Shape : 120 Sq Mtr iii. 01 No of Boarding Pontoon : 40 Sq Mtr Location: Tehri Lake, Uttrakhand, India Material: ACR Dock HDPE Modular System Completion date: March 2013
Integrated Drive on Docks for Jet ski, Modular Pontoon for Boats at Gangapur Dam, Near Nashik, Maharashtra

Project Details: Total Area: 30 Sq mtr Pontoon 10 Nos Integrated Drive on Docks for Jet ski Location: Gangapur Dam, Near Nashik, Maharashtra Material: ACR Dock HDPE Modular System Completion date: Feb 2013